Work execution period: 2003 – 2005

Client: Acque del Chiampo S.p.A.

Activities: Preliminary Design, Detailed  Design, Final Design

Amount:  255,000 Euros

This project  required the laying of a ND 125 mm, 1458 m long  cast-iron water supply line from Repele Spring to the neighbouring groups of houses; the laying of a 75 mm OD in HD PE pipeline from Repele Spring to the existing Repele tank; a 125 mm ND, 515 m long  cast-iron water supply line between Repele and Crespadoro; new  75 mm OD substations in HD PE for a total 235 m length for water supply to the isolated groups of house; the complete reconstruction of the connections to the users, water connection to the single house in Via Corte  upstream the tank with a 50 mm OD HD PE pipeline. The project also required the installation of a pressurization system inside the existing tank’s maneuver lock in order to raise water above the tank level  and to ensure at least 3 Bar pressure to the meters of the users in the Repele district; the construction of a disinfection system for both pipelines composed of a pair of hypochlorite dosing pumps with UV system  positioned inside a concrete  booth anchored to a concrete base.

HMR

HMR Srl
Piazzale Stazione, 7
35131 PADOVA
P.IVA 02327500282

Tel. 0498 763 688
Fax 0498 763 382

This website uses third party cookies exclusively to collect analytics data. If you continue browsing or close this notice, you will accept their use. To know more about it read our Privacy Policy . ×
You allowed the use of cookies