Papalini Spring water supply line expansion

progetto40

Work execution period: November 2008 – March 2009

Client: Acque del Chiampo S.p.A.

Activities: Final Design, Landscaping Report, Design Phase Safety Coordination

Amount:  238,395 Euros

The water supply line from Papalini Spring serving the municipalities of  Crespadoro and S. Pietro Mussolino had already been replaced up to the section immediately downstream from the UV system. With this project, the municipal authorities requested the substitution of the remaining section approx. 665 m long between the UV system’s selective check dam with electrowelded steel De 250 piping to be laid in the bed of the existing pipeline along the Vicinale dei Papalini Road along the Chiampo Stream. The materials chosen and the technical solutions adopted  were linked closely to the local environmental conditions, which due to the presence of extended rocky sections with slippage tendency required the use of pipelines in electrowelded steel longitudinally lined with centrifuged mortar externally sheathed in light-blue coloured extruded triple-layer polyethylene provided with additional anti-rock protection. The intervention required excavation to a depth of around 1.10 m,  a minimum 0.75 m covering over the pipeline, and the laying of a 10 cm layer of macadam over the existing mountain road for the entire length of the project.

HMR

HMR Srl
Piazzale Stazione, 7
35131 PADOVA
P.IVA 02327500282

Tel. 0498 763 688
Fax 0498 763 382

This website uses third party cookies exclusively to collect analytics data. If you continue browsing or close this notice, you will accept their use. To know more about it read our Privacy Policy . ×
You allowed the use of cookies