Recovery of S. Lazzaro degli Armeni

progetto11

Work execution period: 2001-2005

Client: Consorzio Venezia Nuova

Activities: Design Phase and Execution Phase Safety Coordination

Amount:  9.894 million Euros

This reclamation project implemented to upgrade the shoreline defence works around the entire island in terms of both environmental protection and residential redevelopment consisted in the excavation of the existing canals, the installation of injection grouted micropiles, the demolition of the existing walls, the sinking of sheet piles, the creation of new containment walls in facing brick with curbs in limestone or brick, the replacement or reconstruction of the steps on the moorings, and the demolition and reconstruction of the cabin. The latter, octagonal in shape, is built in exposed brickwork  and whiter limestone and features an accessible terrace  paved with hollow tiles  and brick laid on edge, while the inside upper story floor  slab features an arch in brick supported by a ceiling slab in reinforced concrete.

HMR

HMR Srl
Piazzale Stazione, 7
35131 PADOVA
P.IVA 02327500282

Tel. 0498 763 688
Fax 0498 763 382

This website uses third party cookies exclusively to collect analytics data. If you continue browsing or close this notice, you will accept their use. To know more about it read our Privacy Policy . ×
You allowed the use of cookies